Sort:
3-month rolling averages
Non-OB / Excluded Partners
Draft Assignments
0
this session
Pre-Assigned
0
from Qgenda upload
Open Slots
-
still need filling
Month
-
scheduling period
Upload Calendar By Staff to begin scheduling.
Scheduling Month v14.2
No data
upload Calendar By Staff
Open Slots
-
UV AM + UV PM + SF total
Constraint Warnings
-
across all suggestions
Hard Blocks
-
providers blocked by rules
HARD STOP Rule violation -- cannot assign
WARNING Soft rule -- flag but allow
PRE-VAC Off the next day -- still suggested, ranked lower; check with them first
REQ-VAC Night before requested vacation
SPACING Shift within 2-3 day window
WKND-COOLDOWN Works the weekend before or after -- still listed, lower priority
WKND-LIMIT Already has a Fri/Sat/Sun this month -- not suggested; in the list under Blocked by a rule
M 2/4 Q 7/12 12-hour shifts assigned / allotted: this month, rolling quarter (hover for the list)
Close calls go to partners who cover both sites: 50/50 first, then 75/25 and SFH-only, then UVH-only
MONTH FULL Already at their monthly total -- listed after everyone who is not
BEST FIT Top candidate for this slot
Green border = already scheduled in Qgenda
Show:
Order:
Upload a Calendar By Staff report to see the scheduling board.
Allotment tracker 12-hour shifts · QGenda + your drafts · updates as you draft
Count
Upload a Calendar By Staff report to see the tracker.
Month Loaded
None
upload Calendar By Staff
Fully Available
-
0-2 vacation days
Partial
-
3-10 vacation days
Limited
-
over 10 vacation days
Upload a Calendar By Staff report above to see September availability.